THE INSTALLATION PROCESS

The installation process is comprised of three main parts which, depending on the size of the floor, will take just 1-2 days.

First, we begin by diamond grinding the surface down to the bare concrete to ensure the coating properly adheres. This includes the removal of any existing coatings and the filling of any cracks, spalling or any other necessary repairs to the concrete.

Grinding of floor

Helvetica Light is an easy-to-read font, with tall and narrow letters, that works well on almost every site.

Base coat epoxy
flooring flakes

Then, we apply a base coat with added moisture mitigation system. Once evenly applied, flakes in the color of your choice are broadcasted to evenly fall and coat every square inch of the coated floor. We then let this sit and dry for about an hour to ensure the flakes are fully adhered to the floor.

When drying is completed, we then come in and collect the remaining loose flake from the top of the floor. This includes scraping and vacuuming to leave a smooth, even surface for a clean top coat application. Once completely loose flake-free, the top coat is applied and evenly distributed over the floor, leaving the floor with a glossy and polished finish.

polyaspartic top coat
finished floor

WATCH US WORK         CLICK TO PLAY